Lightsave Projects

 

Return on Investment Case Study…

Crowne Plaza Plymouth

The Crown Plaza Plymouth wanted to save on lighting for the back-of-house rooms and the gym areas. We successfully achieved this by choosing the best suited fittings and lamps for each area whilst at the same time keeping within the hotel’s budget. Conducting a return on investment survey highlighted where old fluorescent and CFL fittings were and where best to make changes and upgrades.

Crowne Plaza Plymouth hotel exterior photo.
Lightsave Projects Case Study Save Money

Save Money

We complete Return on Investment surveys to calculate how much you can save in energy and in costs.
Lightsave Projects Case Study Save Energy

Save Energy

We support you with expert project management, every step of the way.
Lightsave Projects Case Study Enhance Experience

Enhance Experience

Our 5 step process ensures the efficiency and success of your project to completion.

Saving from Switching

Lightsave Projects Case Studies Annual Energy Savings Increase
Energy Savings Increase
0 %
Lightsave Projects Case Studies Annual Cost Savings
Annual Cost Savings
£ 0
Lightsave Projects Case Studies Return on Investment Time
Return Time of Investment
0 months
Lightsave Projects - Cost Savings Over Lamp Life
Cost Savings Over Lamp Life
£ 0
Lightsave Projects Case Study Statistics Annual Energy Savings KWH
Annual Energy Savings
0 kwh
Lightsave Projects Case Study Statistics Annual Carbon Savings
Annual Co2 Savings
0 tons
Crowne Plaza Plymouth gym reception area after lighting project completion.

 

Spotlight On…

The Gym Area

The gym reception area was using compact fluorescent 4 pin fittings so when we changed these to the Ansell Gamma this area really benefitted from more efficient LED versions and gave a sleek and modern look as well. The weights room had T5 fluorescent tubes swapped for Ansell Topline LED battens giving the room a bright light to give an energising feel.

The Products

Some of the lamps used included the Ansell Tornado LED Battens, Ansell Gamma and Philips CorePro lamps used in one of the bar areas.

The Bottom Line…

Small Changes, Big Impact

Male and female changing rooms were fitted with the Ansell Gamma in cool white. Lightsave Projects not only want to save on energy and costs for the hotel but to also take into consideration the overall feel of the room, making sure all fittings have the same lighting colour temperature throughout giving the best outcome possible.

 

The bar cellar now has Ansell 4 foot battens that are IP65 to make sure that they last and stay safe due to the damp and dusty environment that a cellar often has. These were also used for a number of the back-of-house rooms including workshop areas store rooms and laundry rooms.

Crowne Plaza Plymouth Reception.
Crowne Plaza Plymouth ROI numbers by Lightsave Projects.

Ready to Start Saving Money
on Your Lighting?